The brief was to remove the tracery and the lower brick wall housed with the main arch area.
This job was done over a period of time. The house was texture coated before the landscaping works started

The brief was to remove the tracery and the lower brick wall housed with the main arch area.
This job was done over a period of time. The house was texture coated before the landscaping works started